Device space requirements:
We need approximately 2 x 2 meters to ensure that players can comfortably fit at a proper distance from the display
Installation time:
About 30 minutes. Arrival 1 hour before the start.
Electricity demand:
Simple wall connector (230V)
How many can use in 1 hour:
It depends on the chosen game.
On-site regulations:
The activity should ideally be placed against a wall. For outdoor events, coverage must be provided.